Our Stream

Our Stream
after the rain

Thursday, March 14, 2013

March 14th

Wow! is all I can say. We sold all 16 pups from the three litters, got a new black tri male, and got our new mobile home in. Still waiting for the final on it. We are in the process of putting in steps right now. There were many steps in the process of this venture. We had a slab put in, Roy trenched for the electrical and water and propane. Those were put in and he then did the back fill. The mobile was brought in after the inspections on the wiring and trenches passed. Then the crew blocked and connected the water, sewer, electrical after bringing the two sections together. The insides were tape and textured, then they put the perimeter wall on. more inspections, then Roy did the back fill and has brought in numerous loads of dirt from down the hill. There is a lot of rock in it which he has removed. We then had a couple of loads brought in for our fire inspection rules of our driveway. We passed that inspection. and while all this has happened, our mare Ruby had her dunn filly. We are now doing our steps and slab for the front and back doors. Our friend has been helping us do the slab and we hired out the stairs to be made. It has cost a lot of money on the side, but  well worth it. Nathan comes home from his mission next Wednesday the 20th. hopefully we will be done with our finals by then. And through all this I have been sick with sinus infection and a miserable neck that I threw out going in and out of our shed with the puppies in it.